Колонка редактора - Eng

Назад


Analysis of methods risk assessment of supply selection

UDK: 69.009

Ju.V. Vedernikova

This article is about risk event which is in the basis of construction operations. In the article the author describes several methods that are most interesting and suitable for modification, in his opinion, developed and used both in Russian and foreign practice. These methods have affected such areas as construction, housing and utilities, energy and public procurement. For analysis, all methods are summarized by the author in the general table, a rating of frequency of occurrence of those or other criteria is made. The review of methods for assessing the risks of contractors showed that the overall criterion for all methods, as expected, was the cost of work or the "price of the contractor", in addition, the qualifications, reputation, material and technical base of the contractor, the duration and quality of work, etc. were taken into account. Work in the modification of the most appropriate, in the author's view, the method is expected to use such criteria as the customer's experience with the contractor, as well as the labor intensity of the project.

Файл: Ведерникова.pdf, 7 pag.

Рубрика: Менеджмент в строительстве
Выпуск №8: По материалам IX Всероссийской молодежной конференции аспирантов, молодых ученых и студентов «СОВРЕМЕННЫЕ ТЕХНОЛОГИИ В СТРОИТЕЛЬСТВЕ. ТЕОРИЯ И ПРАКТИКА», (Часть I ,июнь, 2017)


Copyright © 1998-2024
РЦИ ПНИПУ, ПРЕСС-СЛУЖБА ПНИПУ
8 (342) 2-198-119, 2-198-221, newschannel@pstu.ru
Наверх